EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
log [2015/05/28 09:42] – [12th Meeting (2015-05-28)] epsatiseplog [2015/06/04 12:01] (current) – [13th Meeting (2015-06-04)] team5
Line 370: Line 370:
   * After visiting the workshop we are worried about the equipment only being suitable to metal, would it be in our clients interest to outsource the wood cutting to a laser cutting service out with the university?   * After visiting the workshop we are worried about the equipment only being suitable to metal, would it be in our clients interest to outsource the wood cutting to a laser cutting service out with the university?
  
 +In [(Gaudiosi1996899)], 
 === Minute: === === Minute: ===
 ==== 13th Meeting (2015-06-04) ==== ==== 13th Meeting (2015-06-04) ====
  
 === Agenda: === === Agenda: ===
-  *  +  * What must the final presentation contain and approximately, how long must it last? 
-  *  +  * What must be included in the final sections of our report, both functionalities and testing? 
-  *  +  * Bib is not working at the moment. What is wrong? 
-  * +  * What is the current status of the material purchased? 
 +  * We found a servomotor, can you take a look and give us a feedback? http://www.ptrobotics.com/servo/3292-micro-servo-high-powered-high-torque-metal-gear-mg92b.html?search_query=servo+motor&results=57
  
 === Minute: === === Minute: ===
QR Code
QR Code log (generated for current page)