Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| log [2015/05/28 02:27] – [12th Meeting (2015-05-28)] team5 | log [2015/06/04 12:01] (current) – [13th Meeting (2015-06-04)] team5 | ||
|---|---|---|---|
| Line 74: | Line 74: | ||
| - Submitted Materials List | - Submitted Materials List | ||
| - Visited Suppliers | - Visited Suppliers | ||
| + | - Aki | ||
| + | - Leroy Merlin | ||
| - Produced Blueprints for Manufacture | - Produced Blueprints for Manufacture | ||
| - Refined Manufacture Process | - Refined Manufacture Process | ||
| ==== 12th Week Report ==== | ==== 12th Week Report ==== | ||
| + | - Built the foam model | ||
| + | - Begin Video | ||
| + | - Completed Poster | ||
| ==== 13th Week Report ==== | ==== 13th Week Report ==== | ||
| Line 349: | Line 354: | ||
| === Agenda: === | === Agenda: === | ||
| - | * In the User Manual will we consider the use of the boat while in operation? via computer, pre-existing programmed locations or some other form of transition. | + | * In the User Manual will we consider the use of the boat while in operation via computer, pre-existing programmed locations or some other form of transition? |
| * We have sourced a possible actuator from Festo, but there is a problem finding a price. We have registered, emailed and even tried to call with little success. | * We have sourced a possible actuator from Festo, but there is a problem finding a price. We have registered, emailed and even tried to call with little success. | ||
| * We are still finding trouble arrange equations and the bibliography is working but not to the template standard. | * We are still finding trouble arrange equations and the bibliography is working but not to the template standard. | ||
| + | Equation \ref{eq: | ||
| + | <WRAP centeralign> | ||
| + | \begin{equation} | ||
| + | \cos\alpha=\frac{\hat{A}\cdot\hat{B}}{|\hat{A}\|\hat{B}|}\equiv\frac{\sum_{j=1}^{n} \hat{A}_j \hat{B}_j}{\sqrt{\sum_{j=1}^{n} \hat{A}^{2}_j}\sqrt{\sum_{j=1}^{n} \hat{B}^{2}_j}} | ||
| + | | ||
| + | \end{equation} | ||
| + | </ | ||
| + | |||
| + | This is a reference to a book [(Gaudiosi1996899)] | ||
| + | |||
| + | * After visiting the workshop we are worried about the equipment only being suitable to metal, would it be in our clients interest to outsource the wood cutting to a laser cutting service out with the university? | ||
| + | |||
| + | In [(Gaudiosi1996899)], | ||
| === Minute: === | === Minute: === | ||
| ==== 13th Meeting (2015-06-04) ==== | ==== 13th Meeting (2015-06-04) ==== | ||
| === Agenda: === | === Agenda: === | ||
| - | * | + | * What must the final presentation contain and approximately, |
| - | * | + | * What must be included in the final sections of our report, both functionalities and testing? |
| - | * | + | * Bib is not working at the moment. What is wrong? |
| - | * | + | * What is the current status of the material purchased? |
| + | * We found a servomotor, can you take a look and give us a feedback? http:// | ||
| === Minute: === | === Minute: === | ||
| - | ==== 14th Meeting (2015-05-11) ==== | + | ==== 14th Meeting (2015-06-11) ==== |
| === Agenda: === | === Agenda: === | ||
| Line 372: | Line 391: | ||
| === Minute: === | === Minute: === | ||
| - | ==== 15th Meeting (2015-05-16) ==== | + | ==== 15th Meeting (2015-06-16) ==== |
| === Agenda: === | === Agenda: === | ||