log [2015/05/20 19:19] – [11th Meeting (2015-05-21)] team5log [2015/06/04 12:01] (current) – [13th Meeting (2015-06-04)] team5
Line 66: Line 66:
  
 ==== 10th Week Report ==== ==== 10th Week Report ====
-  - Completed Materials List +  - Draft Materials List 
-  - Completed Drawings+  - Draft Drawings
   - Started Paper   - Started Paper
   - Started Video   - Started Video
   - Acquired Material for Foam Model   - Acquired Material for Foam Model
 ==== 11th Week Report ==== ==== 11th Week Report ====
 +  - Submitted Materials List
 +  - Visited Suppliers
 +    - Aki
 +    - Leroy Merlin
 +  - Produced Blueprints for Manufacture
 +  - Refined Manufacture Process
  
 ==== 12th Week Report ==== ==== 12th Week Report ====
 +  - Built the foam model
 +  - Begin Video
 +  - Completed Poster
  
 ==== 13th Week Report ==== ==== 13th Week Report ====
Line 337: Line 346:
 === Agenda: === === Agenda: ===
   * Completed Material List with the supervision of Fernando Ferreira.   * Completed Material List with the supervision of Fernando Ferreira.
-  * Improved Project Development Chapter +  * Improved Project Development Chapter. 
-  * Completed view of the manifacturing stages: Which tools are available on the workshop? +  * Completed view of the manifacturing stages: Which tools are available on the workshop?  
   * View of the electronic dispositives: Do we have to buy and apply actuators despite our budget is already over?   * View of the electronic dispositives: Do we have to buy and apply actuators despite our budget is already over?
  
Line 345: Line 354:
  
 === Agenda: === === Agenda: ===
-  *  +  * In the User Manual will we consider the use of the boat while in operation via computer, pre-existing programmed locations or some other form of transition? 
-  *  +  * We have sourced a possible actuator from Festo, but there is a problem finding a price. We have registered, emailed and even tried to call with little success.  
-  *  +  * We are still finding trouble arrange equations and the bibliography is working but not to the template standard.
-  * +
  
 +Equation \ref{eq:cosinesimilarity} illustrates how to write equations.
 +<WRAP centeralign>
 +\begin{equation}
 +    \cos\alpha=\frac{\hat{A}\cdot\hat{B}}{|\hat{A}\|\hat{B}|}\equiv\frac{\sum_{j=1}^{n} \hat{A}_j \hat{B}_j}{\sqrt{\sum_{j=1}^{n} \hat{A}^{2}_j}\sqrt{\sum_{j=1}^{n} \hat{B}^{2}_j}}
 +     \label{eq:cosinesimilarity}
 +\end{equation}
 +</WRAP>
 +
 +This is a reference to a book [(Gaudiosi1996899)]
 +
 +  * After visiting the workshop we are worried about the equipment only being suitable to metal, would it be in our clients interest to outsource the wood cutting to a laser cutting service out with the university?
 +
 +In [(Gaudiosi1996899)], 
 === Minute: === === Minute: ===
 ==== 13th Meeting (2015-06-04) ==== ==== 13th Meeting (2015-06-04) ====
  
 === Agenda: === === Agenda: ===
-  *  +  * What must the final presentation contain and approximately, how long must it last? 
-  *  +  * What must be included in the final sections of our report, both functionalities and testing? 
-  *  +  * Bib is not working at the moment. What is wrong? 
-  * +  * What is the current status of the material purchased? 
 +  * We found a servomotor, can you take a look and give us a feedback? http://www.ptrobotics.com/servo/3292-micro-servo-high-powered-high-torque-metal-gear-mg92b.html?search_query=servo+motor&results=57
  
 === Minute: === === Minute: ===
-==== 14th Meeting (2015-05-11) ====+==== 14th Meeting (2015-06-11) ====
  
 === Agenda: === === Agenda: ===
Line 369: Line 391:
  
 === Minute: === === Minute: ===
-==== 15th Meeting (2015-05-16) ====+==== 15th Meeting (2015-06-16) ====
  
 === Agenda: === === Agenda: ===
QR Code