Logbook

The logbook was regimented so that each week a different team member produced the Agenda and Minutes of the Advisor Meetings, Activities and Weekly Reports. This allowed each member to hone their recording and preparation for the coming week ahead.

Weekly Report

1st Week Report

  1. Team allocation
  2. Delivered proposals
  3. Proposals investigation
  4. Selection of Project #13 (Autonomous Sailing Boat)

2nd Week Report

  1. Researched major boat components & standards
  2. Familiarised and updated Wiki
  3. Distributed tasks among team members in their favoured fields
  4. Attempted to arrange a client meeting

3rd Week Report

  1. Requirements
  2. Functions test
  3. Find cases of such designs and implementations
  4. Gantt chart
  5. Project management scope
  6. Team building presentation
  7. Meeting with client

4th Week Report

  1. State of the Art
    1. Boat Components/Geometry
    2. Mechanical Principles
  2. Define Market Plan
  3. Meeting with Fernando

5th Week Report

  1. Eco-eficiency Measures for Sustainability
    1. Presentation
    2. Collated into report
  2. Marketing Finalisation
  3. Material List Planning
  4. State of Art Finalisation
  5. Visited the Sport Club do Porto with Benedita

6th Week Report

  1. Interim Assessment
    1. Collate all acquired information from Sustainability, Marketing and Ethics to Report
    2. Presentation

7th Week Report

  1. Interim assessment wiki and presentation corrections
  2. Began calculations
  3. Began Materials research

8th Week Report

  1. Calculations on buyoancy, Lifts and moments with Fernando Ferreira.
  2. Adjusting calculations in different cases.
  3. Study of properties of different materials.
  4. Study of work processes with different materials.
  5. Researching possible providers for wood.

9th Week Report

  1. Calculations Draft
  2. Basic Drawings/Concepts
  3. Optional Materials
  4. Possible Autonomous Control Testing

10th Week Report

  1. Draft Materials List
  2. Draft Drawings
  3. Started Paper
  4. Started Video
  5. Acquired Material for Foam Model

11th Week Report

  1. Submitted Materials List
  2. Visited Suppliers
    1. Aki
    2. Leroy Merlin
  3. Produced Blueprints for Manufacture
  4. Refined Manufacture Process

12th Week Report

  1. Built the foam model
  2. Begin Video
  3. Completed Poster

13th Week Report

14th Week Report

15th Week Report

Meetings

1st Meeting (2015-02-26)

Agenda:

Minute:

The first meeting consisted of group allocation and proposal introductions, Benedita Malheiro presented a series of project proposals to which the group had to select in favour of undertaking. The proposals were discussed among the group and #13 and #7 were shortlisted as our favoured options. Benedita also discussed the Electronic Logbook which we could access through Wiki and the importance of updating this throughout our semester.

2nd Meeting (2015-03-05)

Agenda:

Objective

Design

Technology

Client

Budget

Minute:

  1. Individual rigid sail design to ease control and manoeuvrability of the boat.
  2. Length dimension ranging from 2-3 metres.
  3. To be used in any body of water (sea, lake, river etc.)
  4. Design a storyboard to accompany the boat selection process.
  5. Autonomous controls must be considered when designing the boat.
  6. A polystyrene/other suitable material model due late March.

3rd Meeting (2015-03-12)

Agenda:

Objective

  1. Are there available raw materials in the workshops?
  2. Can you help us arrange a meeting with Alfredo?
  3. Can we buy materials also after the deadline?
  4. Can we base our calculations on only one book? Can also Fernando can give us help understanding the contents?
  5. Where can we find a starting point on the main dimensions? Can we take an existing boat as a model?

Marketing

  1. For the marketing plan, do we have to consider our prototype or the final product? just the sail boat or with the autonomous part?
  2. Our real target market?

We had a meeting yesterday with Eduardo Silva, and so lots of questions were resolved.

Minute:

The Week Ahead:

4th Meeting (2015-03-19)

Agenda:

Objective

Testing

Minute:

The main focus for this week is to focus on the state of art, which we are allowed to reference books in our own languages to gain a greater understanding of the information.

5th Meeting (2015-03-26)

Agenda:

Objective

Minute:

6th Meeting (2015-04-09)

Agenda:

Minute:

Individually the advisors voiced their opinions of both the interim report and interim assessment. The following points were discussed:

Next development is to concentrate on the rigid wing-sail and produce a viable concept where it can be completed in a quick processes then concentration of the hull design must be addressed. If time is running low we may choose to externally purchase a hull of adequate size and scale although we must produce a hull development concept to ensure the purchased hull is the correct selection.

7th Meeting (2015-04-16)

Agenda:

Minute:

8th Meeting (2015-04-23)

Agenda:

Minute:

As a team we have to justify the materials selection over the coming week, sourcing and quantifying the quantity of material required for our design, which must also be advanced following each components required dimensions. As soon as these calculations are complete the materials list can be send.

9th Meeting (2015-04-30)

Agenda:

Minute:

The materials selection must adhere to the maximum weight of 15 kg, these properties must be compared and the most adequate must be purchased, as components such as the mast don't work quite like normal masts. Normal mast sailboats have rigging and cables that take a lot of strain off the mast as our boat does not include these it is extremely more flexural in a rigid wing sail. A material in with a large yield must be selected to prevent deformation when in operation.

10th Meeting (2015-05-14)

Agenda:

Minute:

11th Meeting (2015-05-21)

Agenda:

Minute:

12th Meeting (2015-05-28)

Agenda:

Equation \ref{eq:cosinesimilarity} illustrates how to write equations.

\begin{equation} \cos\alpha=\frac{\hat{A}\cdot\hat{B}}{|\hat{A}\|\hat{B}|}\equiv\frac{\sum_{j=1}^{n} \hat{A}_j \hat{B}_j}{\sqrt{\sum_{j=1}^{n} \hat{A}^{2}_j}\sqrt{\sum_{j=1}^{n} \hat{B}^{2}_j}} \label{eq:cosinesimilarity} \end{equation}

This is a reference to a book [Gaetano Gaudiosi, 1996]

In [Gaetano Gaudiosi, 1996],

Minute:

13th Meeting (2015-06-04)

Agenda:

Minute:

14th Meeting (2015-06-11)

Agenda:

Minute:

15th Meeting (2015-06-16)

Agenda:

Minute:

Activities

Start End Task Description Who
25/02 26/02 Proposal unveiling and selection Discussed the possible projects and selected accordingly to our specialised areas Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
27/02 04/03 Research and Task delegation Each member given different subject areas to research familiar to their subjects Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
04/03 04/03 Wiki Updates For filled wishes to complete certain Wiki areas before 2nd meeting Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
/03 /03 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
05/03 10/03 Project Schedule We all contributed to the development of the project schedule by completing a GANTT chart which represents all tasks and deliverables to the customer. Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
09/03 11/03 Teambuilding Presentation The entire team worked on our presentation for the team building section of the course. Completing a 3 minute clip discussing each other background and how we are going to carry out the EPS programme. Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
11/03 11/03 Client Meeting The team met with Eduardo Silva our client in the LSA facility, we discussed the project in great depth and received a greater understanding of the goal for the sailboat. Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
12/03 19/03 State of the Art The entire team divided the SotA according to our strengths and spent the week researching and understand the full components and mechanical principles that apply to the boat. Previous work was also research to give a platform of how to approach the design. Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
17/03 17/03 Meeting with Advisor The team had a meeting with Fernando to go over several queries regarding the State of the Art, it was concluded at the end of the meeting to progress on. Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
18/03 20/03 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
23/04 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
25/03 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
26/03 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
28/03 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
01/04 Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
05/04 05/04 Upload Interim Report and Presentation Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
05/04 09/04 Presentation Preperation Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
09/04 09/04 Interim Report and Presentation Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther
Roberto Giordano, Gizem Ozturk, Gary Jonathan Rabone, Marc Navarrete Hill, Imre Asztalos, Thies Gunther

[Gaetano Gaudiosi, 1996], [Gaetano Gaudiosi, 1996] Gaetano Gaudiosi, 1996. Offshore wind energy in the world context. Renewable Energy, 9, pp.899-904, ISSN 0960-1481.